Investor: Long Son Petrochemicals Co., Ltd
Located at: Long Son Petroleum Industrial Park, Long Son, Vung Tau City, Ba Ria – Vung Tau
Scope of work: E&I Construction, calibration and loop test at Package C,G
Contractor: SHINBO VI NA Co., Ltd & Power engineering consulting jont stack Company 5
Year: 2020 – 2021